77 years of industry experience, deeply understanding the pain points in manufacturing sites

Products originate from on-site needs, with business-driven as the core, precisely addressing the challenges of production-sales coordination and delivery in manufacturing enterprises.

Enterprise Manager

Difficulty in implementing high-level strategies
Lack of data basis for resource allocation
Low on-time delivery rates and inaccurate delivery commitments
High inventory levels and tight cash flow

Production Planning Supervisor

Frequent rescheduling of plans
Manual production scheduling fails to keep up with demand
Large deviations between plans and actuals
Insufficient multi-version scheduling

Procurement Manager

Disconnection between procurement and production
Insufficient material availability
Invisible supplier progress
Frequent emergency procurement

Production Manager

Production plans are difficult to implement  
Frequent material shortages in production  
Frequent mold and line changes  
Numerous adjustments for urgent and rush orders

IT Head

Severe information silos, making cross-departmental collaboration difficult
Weak system configurability, heavy burden for secondary development
Complex cross-organization master data synchronization and permissions
Proliferation of systems, complex interfaces, and difficult implementation

HuiPulse APS Supply Chain Resource Planning and Scheduling Platform

Integrate human, material, and time resources to establish a four-in-one production system featuring customer, factory, subcontractor, and supplier integration, characterized by pull-based, collaborative, just-in-time, and intelligent operations.

Intelligent Planning Solutions Born from the Manufacturing Floor

Driven by intelligent algorithms, with end-to-end visual management, it empowers enterprises to build an efficient, agile, and sustainable excellence system.

Supply Chain Planning and Scheduling

Manufacturing Operations
Optimization Philosophy

From Order to On-Time Delivery | From Local to Global

• Production -
Optimize bottleneck processes, reduce changeover waste, and increase capacity.
• Supply -
Dynamic Material Requirements Planning, reduce inventory, avoid material shortages
• Plan -
Quickly generate the most satisfactory scheduling plan that meets delivery dates and production capacity.
• Sales -
Accurate delivery date response, enhancing customer trust and on-time rate
• Operations -
Monitor progress and bottlenecks in real time, and flexibly adjust to reduce costs.
• Strategy -
Intelligent production and sales forecasting to achieve stable growth with maximized profits
Supply Chain Planning and Scheduling

Modular
Industry Configuration Package

Meeting Customer Needs | Industry-Specific Solutions

• Auto Parts -
Demand forecasting for rapid production scheduling, coordinating with suppliers for efficient supply
• Machining -
Shorten the design-to-delivery cycle and reasonably schedule machines and tools.
• Assembly -
BOM Kitting Scheduling, Reducing Material-Waiting Work Orders and Shop Floor Stagnation
• Fasteners -
Furnace resources follow a simultaneous in-and-out flow, with cold forging/hot forging processes utilizing a pull-push sequence.
• 3C Electronics -
Multiple models, complex substitute materials, dynamic complete set inventory
• Lighting -
Intelligent medium- and long-term production and sales forecasting, profit maximization, and stable growth
Supply Chain Planning and Scheduling

Core Intelligent Scheduling

Microservices Architecture | Proprietary MCPA Algorithm

• AI Intelligent Integration -
Embedded intelligent models, optimizing predictions one step ahead
• Original DRN Technology -
Transparent decision-making, high controllability, real-time scheduling
• MCPA Algorithm -
Nested Constraint Second-Level Rearrangement, Resilient and Efficient
• Microservices Architecture -
Decoupled flexible deployment, supporting rapid elastic scaling
• Multi-mode Adaptation -
Flexible support for multiple production modes and scheduling strategies
• Visual Scheduling -
Stepped Gantt charts visually display scheduling results
• Hierarchical Permission Management -
Enterprise-level data security with hierarchical and role-based access control
Supply Chain Planning and Scheduling System

Impeccable Service

Powerful Implementation Team | Accompanied Implementation and Continuous Optimization

• Companion Delivery -
70% of the implementation team members have experience with Lighthouse Factories.
• Dual Circulation Implementation -
Govern data while launching, continuously driving optimization
• Full Character Configuration -
Covering consultants, architects, implementation, after-sales, and maintenance teams
• Full System Integration -
Proficient in upstream and downstream systems such as MES, ERP, and WMS.
• Light Consulting Services -
Empower customers to establish standardized processes, develop digital roadmaps, and provide end-to-end services from consulting to implementation.
Supply Chain Planning and Scheduling System

Lean combined with digitalization

77 Years of Heritage | Born from Real Manufacturing Needs

• Manufacturing DNA -
The group was founded in 1948, with 77 years of manufacturing heritage.
• Lean Management -
Deep integration of AI+IT technology into lean management philosophy
• Industry Certification -
Intelligent Manufacturing Maturity Level 3, Recommended by China Academy of Certification and Evaluation
• Originating from the Group -
System design originates from the production site, with a deeper understanding of customer needs.
• Continuous Service -
Accompanying clients in their long-term growth, empowering factories to continuously optimize.
• Continuous Innovation -
Emphasizing high R&D investment to continuously create value for customers

Profound Accumulation, Professional Empowerment, Intelligent Manufacturing Leadership, Deep Understanding of On-Site Application Scenarios

Committed to providing you with more comprehensive solutions.

Medium to Long-Term Demand Forecasting

Inventory occupancy reduced by 10-25%

Auto parts3C electronicsFMCG

Rapid Delivery Response

Lead time response time reduced by 90%

3C ElectronicsMachiningAuto PartsEquipment

Material Kitting Management

Downtime due to material shortages reduced by 20-30%

3C ElectronicsEquipmentAuto PartsACG Grains

Capacity Bottleneck Optimization

Capacity utilization rate increased by 15-30%

SemiconductorsAutomotive PartsElectronicsMetal Smelting

Intelligent Visual Scheduling

On-time delivery rate increased by 10-20%

MachiningInjection Molding3C ElectronicsFastenersEquipment

Precise on-time delivery

Operating costs reduced by 25-30%

3C ordersmachiningautomotive partsequipment manufacturingfasteners

Urgent order insertion with second-level response

Order fulfillment efficiency increased by 95%

Fast-moving consumer goodsinjection moldingmachiningelectronicsprinting and packaging

Plan-driven

Overall production efficiency increased by 30%.

3C ElectronicsMachiningEquipment Manufacturing

The Intelligent Brain and Command Center of the Enterprise

Plan-driven, connecting production, warehousing, logistics, and supply to build a full-process digital operations closed loop, ensuring tight integration between planning, execution, and delivery.

HuiPulse APS Supply Chain Resource Planning and Scheduling Platform
What you purchase is not just a system, but a set of lean management experiences that can be continuously improved.
Get it for free now

Lighthouse Factory Experience
Accompanied Delivery

Native
Self-developed System

Intelligent Manufacturing
Maturity Level 3

China National Institute of Standardization
Certification Recommended

Business and technology running in parallel, providing peace-of-mind service throughout the entire process

Starting with consulting and planning, continuously supporting successful implementation and go-live, providing end-to-end full-link escort for enterprise digital transformation processes.

Business Value-Oriented
Prioritize
Digital Transformation Value Objectives
KVI

Discuss and focus on its core concerns
Pinpoint Core Focuses

Digitalization
Technology Trends
Prioritize High-Contribution Value in Digital Transformation
Business Practice Areas (KPIs) and
Key Scenarios Within Them

Plan the Digital Transformation Blueprint
Design Digitalization Blueprint

Digitalization
Technology Blueprint
Prioritize Focus
Digital Transformation Implementation Plan
Overall Input-Output Value

Plan and validate the implementation of technical solutions
Formulate Technical Solution

Digitalization
Technical Implementation Plan
Priority Focus
Digital Transformation Implementation Assessment
Value Contribution Assessment and Assurance

Implementation of Technical Solution
Execute Technical Solution

Digitalization
System Launch
Technology-oriented

HuiPulse APS is transforming the planning and delivery methods of manufacturing enterprises.

Winning long-term customer trust through stable delivery and supply chain collaboration

Guangdong
End-to-end full-process visibility, higher capacity and faster delivery
View More
Bilian Technology
Guangdong
Material Kit Rate Increased by 35%; Precision Material Supply is the Key to Cost Reduction and Efficiency Enhancement
View More
Xiong'ao Industrial
Zhejiang
Pulling ahead before the bottleneck operation and pushing forward to continuously break through capacity bottlenecks.
View More
Yuxing Fasteners
Shanghai
Efficient collaboration among 300 suppliers empowers the automotive 4PL business from 0 to 1.
View More
KUEHNE+NAGEL
Guangdong
Solving the scheduling challenge for millions of SKUs, reducing production cycles by 30%
View More
FA Factory Automation Components One-Stop Supplier
Alpine System Integration (Dalian) Co., Ltd.
Best Practices for Achieving Lean Production Through Digitalization
A smart manufacturing service provider with excellent manufacturing heritage and lean management philosophy
Alps System Integration Co., Ltd. is a wholly-owned subsidiary invested in China in 2005 by the Japanese Alps Alpine Group (founded in 1948).  
With over 20 years of deep cultivation in smart manufacturing, it integrates digital technology and lean management concepts. Leveraging the practical experience from the group's 22 global factories and 7 factories in China, it builds integrated digital solutions for production planning and manufacturing operations tailored to industrial enterprises. These solutions cover cutting-edge fields such as smart manufacturing, IoT, AI, and industrial big data, connecting resources with a global perspective and driving the future with Chinese intelligent manufacturing.
Headquartered in Dalian, Liaoning Province, the company maintains offices or specialized agency implementation service teams in Dongguan, Ningbo, Wuxi, and other locations. As a "Specialized, Refined, Differential, and Innovation" (SRDI) small and medium-sized enterprise, it serves as the Secretary-General unit of the Dalian Intelligent Manufacturing Industry Innovation Alliance. It is a core partner of Dassault Systèmes for intelligent manufacturing, an excellent partner of Huawei in 2023, a service provider for the Liaoning Province Industrial Internet and Intelligent Manufacturing Resource Pool (first batch), and one of the first recommended products for "Industrial Internet Platform Selection and Evaluation." Additionally, it is a CMMM (GB/T 39116-2020) Level 3 product certification service provider.
About the Group
Focus on production and R&D, empowering "Made in China with Wisdom"
  • Founded in 1948
  • Sales of 933.1 billion
  • 190 strongholds
  • 29,926 employees
  • 31.9 billion in research and development expenses
  • 7,473 patents
China's 7 Major Factories
Understand Manufacturing, Understand Lean, Understand Digitalization
  • 2 Regional Headquarters
  • 4 Major R&D Centers
  • 4 Major Sales Bases
  • 7 Major Production Bases
  • 9 Major Branch Offices
  • 6 Major Firms
In the fastener industry, HuiPulse APS possesses deeper vertical expertise.
The Huigenggao® Digital Production Planning Solution ensures every screw delivers precise force.
Click to learn more
关闭
Encountering bottlenecks in smart factory planning? Free intelligent manufacturing diagnostic service, tailor-made upgrade solutions! Welcome to call: 400-676-5650
Get Solutions

Hold on! We have some documents for you~关闭
Feel free to get in touch with us for more product details; We are wholeheartedly at your service.

1000+ factories are viewing this~
Detailed product introduction
Rich application scenarios
Numerous successful cases

Consult Nowclose
Please describe your issue, and our dedicated team will contact you as soon as possible.